Installation Procedures: Exchange Side Panels
3.Remove the side panels from the sides of the PDU and XR Battery Enclosure that will not be adjacent to the UPS.
psx0020a
4. Remove the rear hole covers from the panels that you removed in step 3.
Connect Battery Enclosure communication cables
1.Route the communication cable through the hole between the UPS and the XR Battery Enclosure. Route the cable from the side of the UPS to which it is attached, around the back of the UPS, and through the hole on the other side of the UPS to the front of the XR Battery Enclosure.
2.Connect the cable to Port 1 on the first adjacent XR Battery Enclosure’s XR Communication Card.
3.Connect Port 2 on the first XR Battery Enclosure to Port 1 on the next XR Battery Enclosure. Route the cable the same way as described in step 5. Continue until all XR Communication Cards are connected.
4.Locate the XR Communication Card terminator and insert it into the open port of the last XR Battery Enclosure in your configuration.
| XR Battery Enclosure 2 | Terminator | |||||||||
|
|
|
|
|
|
|
|
|
|
| |
|
| XR Communications Card |
|
|
| Port 1 | Port 2 | ||||
|
|
|
|
|
|
| |||||
XR Battery Enclosure 1 |
| m . |
|
| le |
| |||||
| C | a | b |
| |||||||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| m |
|
|
|
|
|
|
|
|
|
|
| o |
|
|
|
|
|
|
|
|
|
|
| C |
|
|
|
|
|
XR Communications Card |
|
| Port 1 | Port 2 |
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
Symmetra PX UPS |
|
| m. C |
| le |
|
|
|
|
|
|
|
| a | b |
|
|
|
|
|
| ||
|
| m |
|
|
|
|
|
|
|
|
|
|
| o |
|
|
|
|
|
|
|
|
|
|
| C |
|
|
| psx0145a |
|
|
|
|
|
XR Communications Card | Terminator | Port 2 |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
5.Install, on the UPS, the side panels that you removed from the PDU and the XR Battery Enclosure in step 3 and
6.Install, on the PDU and the XR Battery Enclosure, the solid side panel that you removed from the UPS in step 2 and
12 | InfraStruXure System - Installation and |