Connect DC Power Wiring, if Applicable

Electrical Hazard: Only Field Service Engineers or qualified personnel trained by APC may connect the XR Battery Enclosure to the Symmetra PX UPS or to another XR Battery Enclosure.

Warning: The supplied power and ground wires are for internal side-panel wiring only. These wires are not for use in external conduits.

Electrical Hazard: Before you begin connecting the DC power wiring, ensure that there are no battery units installed in the XR Battery Enclosures. Do not install battery units until instructed to do so.

Cascade XR Battery Enclosures

If you have multiple XR Battery Enclosures as part of your InfraStruXure system, you can cascade XR Battery Enclosures to a Symmetra PX UPS. Starting with the XR Battery Enclosure furthest away from the UPS:

1.Route DC output cables and the ground cable (coiled on the floor of the enclosure) from one XR Battery Enclosure to the next XR Battery Enclosure through the adjacent holes in the side panels of the enclosures.

2.Connect the DC output cables from one XR Battery Enclosure to the DC Input Circuit Breaker of the next XR Battery Enclosure [(+) to (+), (CT) to (CT), (–) to (–)].

3.Connect the ground wire from one XR Battery Enclosure to the grounding stud on the next XR Battery Enclosure.

To

XR Battery

Enclosure

XR (GND)

XR (–)

XR (CT)

XR (+)

pxb0007a

To

UPS

XR Battery Enclosure

XR Battery Enclosure

20

InfraStruXure System - Installation and Start-Up

Image 24
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Access the PDU Main Input switch Connect Utility Conductors to the PDUAttach conduit to the PDU for the input conductors Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental APC Worldwide Customer Support 990-1483C03/2008
Related manuals
Manual 44 pages 48.45 Kb