APC 600, 480, 208 manual Confirm Yes, UPS into Bypass No, Abort

Page 41

Start-Up Procedure: Apply power to the system

3. Close (turn ON) the Q3 circuit breaker on the InfraStruXure PDU.

Note: The H2 LED above the Q2 circuit breaker illuminates, indicating that it is safe to operate the Q2 circuit breaker.

4. Open (turn OFF) the Q2 circuit breaker on the InfraStruXure PDU.

The UPS will display a Forced Bypass message on the display interface and the Fault LED will be red.

5.Command the UPS into static bypass operation through the UPS display interface:

a.Press the ESC key to open the top-level menu.

b.Select Control on the top-level menu, and press the ENTER key.

c.Select UPS Into Bypass on the Control menu, and press the ENTER key.

d.On the next screen: select Yes, UPS into Bypass, and press the ENTER key.

Top-Level Menu

 

 

 

 

 

 

Control

Logging

 

 

Status

Display

 

 

Setup

Diags

 

 

Accessories

Help

 

 

 

 

Control Menu

UPS Into Bypass

Do Self Test

Simulate Power Fail

Graceful Reboot

Graceful Turn Off

Start Runtime Cal

Turn Load On

Confirmation Screen

Confirm

Yes, UPS into Bypass No, Abort

Note: The H2 LED above the Q2 circuit breaker illuminates, indicating that it is safe to operate the Q2 circuit breaker.

InfraStruXure System - Installation and Start-Up

37

Image 41
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Attach conduit to the PDU for the input conductors Access the PDU Main Input switchConnect Utility Conductors to the PDU Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 03/2008 APC Worldwide Customer Support990-1483C
Related manuals
Manual 44 pages 48.45 Kb