APC 600, 480, 208 manual Environmental

Page 47

 

 

Specifications: 40 kW InfraStruXure PDU

Physical

PD40F6FK1-M PD40G6FK1-M PD40L6FK1-M

 

 

 

 

 

 

Configuration

Delta to WYE

 

 

 

 

Maximum Power Rating

60kVA

 

 

 

 

Maximum Current Rating

166A

72A

58A

Construction

Cu windings, open core

 

 

 

Temperature Rating

220° C (Class H)

 

 

 

 

Maximum Temperature Rise

150°C

 

 

 

 

Efficiency

97–98%

 

 

 

 

 

 

 

 

 

 

Environmental

 

 

 

 

 

 

 

 

Operating Environment

Protected from water and conductive contaminates

Temperature

 

 

 

 

 

Operating

32 to 104° F (0 to 40° C)

 

 

 

Storage

32 to 113° F (0 to 45° C)

 

 

 

Class

Class H (220° C)

 

 

 

 

Humidity

 

 

 

 

 

Operating

0 to 95%, non-condensing

 

 

 

Storage

0 to 95%, non-condensing

 

 

 

Elevation

 

 

 

 

 

Storage

3,000 ft (10 000 m)

 

 

 

Acoustic Noise Emission

Maximum 50dB(A) at 1 m

 

 

 

Heat Rejection at Full Load

5194 BTU/hr. (1.5 kW)

 

 

 

 

 

 

 

 

 

Compliance

 

 

 

 

 

 

 

 

 

 

 

Approvals

UL 60950, cUL

 

 

 

 

 

 

 

 

 

 

†Transformerless units only.

 

 

 

 

 

†† Provided by customer.

 

 

 

 

 

The specifications are recommendations. Consult the NEC and local codes for requirements specific to your installation.

.

InfraStruXure System - Installation and Start-Up

43

Image 47
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Attach conduit to the PDU for the input conductors Access the PDU Main Input switchConnect Utility Conductors to the PDU Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 03/2008 APC Worldwide Customer Support990-1483C