2.7 VENTILATION AND FIRE SAFETY SYSTEMS

Your new appliance must have proper ventilation to function safely and properly. It is very important to install a fire safety system. Your ventilation system should be designed to allow for easy cleaning. Frequent cleaning and proper maintenance of the ventilation system and the appliance will reduce the chances of fire. Ventilation and fire safety systems must comply with local and national codes. Refer to ANSI 83.11 for a list of reference documents that will provide guidance on ventilation and fire safety systems.

2.8 INSPECTION

Before you begin filling and operating the appliance, perform the following visual checks:

After the appliance is in its permanent location, check to make sure it is level and stable. Any additional leveling that is necessary can be performed as previously described in “Leveling the Fryer”. (See section 2.4)

Ensure that high temperature limit probe(s), item 2 in figures 1.7.1 & 1.7.2 below are in place and secure as shown below. Ensure the temperature control probe(s) (item 1) is positioned properly as shown.

Ensure the heating elements (3) are free to move up out of the frypot without hitting any structures or other items above the fryer.

Review the installation portion of this manual and ensure that all steps have been followed and executed properly.

Figure 1.7.1 Frypot view SELV14

Figure 1.7.2 Frypot view SELV14T

11

L20-406 Rev 5 (3/14)

Image 11
Contents Reduced OIL Volume Frying System To the PURCHASER, Owner and Store Manager Table of Contents Routine Cleaning Theory of Operation Installation Checking and Unpacking Your NEW Appliance Installation Clearances General Installation RequirementsCaster and leg types Leveling the FRYER‐ LEGS/CASTERSRequirements Electrical Connections1 Drain line removed for clarity Optional Cord SET & Plug and Restraint CableInspection Ventilation and Fire Safety SystemsCooking Guidelines Filling the Cooking TankOperation Operational Features Drain Valve Handle Blue Pull to drain frypot Basic Operational FeaturesAppliance Start UP OIL TemperatureComputer Controller Operation Automatic Boil Entry Water Detection To View Current Settings for cook, shake, and hold timesTypical displays using key 4 as an example To perform a Boil Out operationShake Time To Set Cook TemperatureTo Enter Programming Level 1 for the Store Manager Cook TimeFahrenheit or Celsius Display Hold Pre-AlarmTo Exit Level 1 programming To Enter Programming Level 2 for the Store ManagerLanguage Selection Password Change or Required?Beeper Volume and Tone Recovery Test ValueAppliance Shutdown Control or Timer Left side of Dual or Single VatControl or Timer Right side of Dual Vat Other DisplaysAutomatic OIL TOP System Option OIL Management Push Button OIL TOP OFF SystemFlush Hose Operation if equipped Cook Counter AdjustmentQuick Strain Filtering Filter Soon light flashing Replacing the Filter Media if equipped Routine Cleaning Cleaning ScheduleClean Filter Parts Start of DAYInstallation & Operational Selv Manual Cleaning the Cabinet Daily Cleaning InstructionsEND of DAY Cleaning the Cook Tank Weekly Preventative Maintenance Filter Cleaning If EquippedBoil OUT Procedure Monthly Preventative MaintenanceANNUAL/PERIODIC Preventative Maintenance and Inspection Temperature CheckHeating Element Drain Valve Interlock Troubleshooting Power FailureHigh Temperature Limit Fryer Troubleshooting Chart Troubleshooting ChartsProblem Probable Causes Corrective Actions Filter TroubleshootingComputer & Digital Controller Displays Display Problems ActionFrying oil Problem-Solving Possible Cause Solution PROBLEM‐SOLVING ShorteningSelv Installation & Operational Manaual