26CHAPTER 3: INSTALLING AND OPERATING THE VCN ACCESS POINT

Figure 12 Driving Screws into the Wall

10Align the two large holes of the VCN AP (see Figure 13) with the two already driven screws and insert the screw heads into the holes .

Shift the VCN AP downward so that the screw shanks slip into the slots and the topmost indented hole is aligned with the VCN AP's small screw hole.

Figure 13 Screw Holes in the Top of the VCN AP

Large hole

Large hole

Small screw hole

11Drive the last screw into the wall anchor to the full depth.

Page 26
Image 26
3Com DSA-3CV1001-02 Drive the last screw into the wall anchor to the full depth, Screw Holes in the Top of the VCN AP