22CHAPTER 3: INSTALLING AND OPERATING THE VCN ACCESS POINT

Table 5 Unpacking List (continued)

NO.

Item

Quantity

Supplied by

 

 

 

 

3

ac/dc adapter

1

3Com

4

Line cable (RJ-11)

1

3Com

5

Laptop/PC cable (RJ-45)

1

End User or Customer on Request

6

FAX cable (RJ-11)

1

End User or Customer on Request

7

4-pin MiniDIN Control

1

3Com, for Local Management or

 

Cable

 

Troubleshooting Only

8

Long screws1

3

3Com

9

Short screws1,2

3

3Com.

10

Wall anchors1

3

3Com

11

Template2

1

3Com, for Installation only

12

Rubber pads3

4

3Com

1For VCN AP wall installation

2For installing VCN AP under the table

3For VCN AP table top installation

The VCN AC must be installed before the VCN AP. Refer to the Visitor and Community Based Networking Concentrator Unit Service Manual.

Installing the VCN

The VCN AP may be conveniently mounted on one the following:

Access Point

a wall, see page 23.

 

 

under a table, see page 27.

 

on top of a table, see page 32.

Page 22
Image 22
3Com DSA-3CV1001-02 service manual Installing the VCN, Access Point, Wall, see, Under a table, see, On top of a table, see