AltiGen comm 600 manual Configuring NAT

Models: 600

1 65
Download 65 pages 49.16 Kb
Page 36
Image 36

5.Once the IP Phone is rebooted, all LED lights will be on.

6.The LCD screen displays [ATGN BOOT] on the first line.

7.On the second line of the LCD screen, the following messages are displayed in succession:

CHECK MEMORY (RAM checking state)

CHECK FW (Firmware checking state)

BOOTING NOW (Initialization of hardware - LCD, network, DSP, etc.)

INITIALIZING

update APP(S1-S5)

8.You may verify the new version of firmware in the phone’s configuration menu (* * 7 ENTER, then scroll to

System>Version Info).

Resolving Errors Upon Startup

If an error occurs during rebooting, the LED light of Soft Keys 1 through 4 will remain on to indicate an error status. These errors represent hardware failures within the Alti-IP 600.

LED 1 light on = memory check failed

LED 2 light on = network failed

LED 3 light on = DHCP failed

LED 4 light on = attached IP address failed

If the phone successfully passes through these stages, it has started up properly. Otherwise, refer to “Troubleshooting” on page 37.

Configuring NAT

NAT (Network Address Translation) is the translation of an IP address used within one network to a different IP address known within another network. One network is designated as the inside network, the other is the outside. The Alti-IP 600H can be enabled to support H.323 behind NAT. The Alti-IP 600 will be able to work behind a regular NAT router without any special implementation for H.323.

Alti-IP 600 Manual 26

Page 36
Image 36
AltiGen comm 600 manual Configuring NAT