General Information - Site Requirements

Moving the equipment to site:

Before moving the equipment to the installation site, the following should be checked:

Can the transport equipment handle the weight of the system?

Is there enough space to transport the system to its final destination?

Can the raised floor (double floor) handle the weight of the system?

The equipment is delivered on a pallet and can be transported on a fork-lift or a pallet truck.

The UPS is contained in a cubicle with a stable frame. This frame can carry heavy components such as transformers, chokes etc. The frame can be placed directly on a levelled concrete floor.

Clearance at installation site. The system can be installed with the back to the wall or back-to- back - however, a distance of minimum 4 inches (approx. 100 mm) between the wall and the UPS is necessary. 20 inches (approx. 500 mm) is the preferred distance (see below illustration).

A clearance of 20 inches (approx. 500 mm) above the system is necessary to ensure sufficient space for air circulation.

UPS

UPS

Clearance; minimum 100 mm – preferably 500 mm.