Manuals
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
SYMSTRF3I
user manual
Receiving and Unpacking
Models:
SYMSTRF3I
1
24
68
68
Download
68 pages
8.33 Kb
21
22
23
24
25
26
27
28
Troubleshooting
Specification
Install
Alarm
Fault
Safety Symbols
Electrical Wiring Overview
Warranty
Configuration
Module Replacement
Page 24
Image 24
Page 4 -
Receiving and Unpacking
990-7165-001
Page 23
Page 25
Page 24
Image 24
Page 23
Page 25
Contents
380V/400V/415V 31 Frame Model SYMSTRF3I
Limited Warranty
Life Support Policy
Table of Contents
Page
Safety Information
Safety Symbols
Operation Symbols
Radio Frequency Interference
Welcome
Models
Frame Model Description Illustration
System Components
SymmetraTM Component Description
Model Specific Details SYMSTRF3I
SymmetraTM Components Description Specific To Model
SYMSTRF3I
Basic Operation
Glossary of SymmetraTM Terms
8 Introduction
Site Requirements
Operating Space Requirements
Rear Clearance
Front Clearance
Structural Requirements
Models
Short-Term Battery Module Storage Requirements
Environmental Requirements
Heat Output
Electrical Requirements Input/Output
VAC
Electrical Requirements EPO Switch
EPO Specifications
Electrical Wiring Overview
SymmetraTM Component Shipping Weight Shipping Dimensions
Receiving and Unpacking
Receiving the SymmetraTM
Inspect Packaging
Moving The SymmetraTM Frame and Modules
Unpacking the SymmetraTM Frame
4 Receiving and Unpacking
Electrical Installation
Model SYMSTRF3I
EPO Switch Wiring Required
Electrical Requirements
Electrical Wiring Overview
Input/Output Wiring
Input/Output Wiring Procedure
Wire Size
Minimum
Emergency Power Off Switch Wiring Required
Emergency Power Off Switch Wiring Procedure
Bypass Balancing Transformer Wiring Optional
Bypass Balance Transformer Wiring Procedure Optional
Wiring Symbol Description Minimum Wire Gauge
Wiring Verification Procedure
Reported Output Voltage OutVHz
APC Worldwide Technical Support Telephone Numbers
Startup Procedure
Securing The Frame Setting The Leveling Feet
Power Module Installation
Battery Module Installation
System Startup Procedure
Configuration and Advanced Operation
Configuration
Display Settings
System Settings Setup
Advanced Operation
PowerView Interface
PowerView Components
PowerView Component Description
Language Configuration
Language Chip Replacement Procedure
Startup Screen
Top-Level Menu Screen
Control
Status
PowerView Commands
Setup
Accessories
Logging
Display
Function Options
Diagnostics
Help
Wall Mounting the PowerView
Troubleshooting
PowerView Meaning Corrective Action Message Start-Up
PowerView Meaning Corrective Action Message General
PowerView Meaning Corrective Action Message Module
Alarm
Failure
Threshold
PowerView Meaning Corrective Action Message Bypass
Fault
PowerView Meaning Corrective Action Message
General
6 Troubleshooting Appendix B
Module Replacement
Module Failure Alarm Indicators
Technical Support & Obtaining Replacement Module
Returning Modules to APC
Battery Module Replacement
Replacement Battery Module Verification
Power Module Replacement
Replacement Module Verification
Main Intelligence Module Replacement
Replacement MIM Verification
Redundant Intelligence Module Replacement
Replacement RIM Verification
6 Module Replacement Appendix C
Specifications
Input Specifications
Operation
Output Specifications
Physical Specifications
Compliance Specifications
Page
Tel0800 180
Top
Page
Image
Contents