Appendix (cont.)

Cubicle mounting and connection for 2000kVA Static Switch Cubicle

Cubicle mounting

move the cubicles to their operating location;

adjust the front foot pads so that the cubicles are vertical and their doors aligned.

Internal connections between cubicles

install and bolt the supplied fish- plates on the bars for the phases and neutral (L1, L2, L3, N) between the two cubicles (four bars in top and four bars in bottom);

connect the earth strap to the front uprights of both cubicles;

connect the connectors marked XM1 and XM2 from the left cubicle to the connectors marked XF1 and XF2 in the right cubicle.

left cubicle

K2S

right cubicle

 

 

 

on

 

 

 

 

 

 

off

 

 

 

 

 

 

Q4S

 

 

 

N

L1

L2

L3

 

 

 

 

 

 

 

 

 

 

 

on

 

 

 

 

 

 

off

 

 

 

 

 

 

Q3BP

 

 

 

 

XF1-XF2

 

L1

 

L3

 

 

 

N

L2

 

 

 

 

 

 

XM1-XM2

 

 

 

 

 

 

 

 

 

 

 

N

L1

L2

L3

card cage

 

 

 

 

 

 

earth strap to be connected to the front uprights of both cubicles

on

off

Q5N

spacing

uprights

Page 40 - 6739381EN/JD

Page 40
Image 40
APC 6000 installation manual Left cubicle, Right cubicle, Q3BP XF1-XF2 XM1-XM2, Card cage