3. INSTALLATION
3. INSTALLATION
CAUTION
Machine installation should only be carried out | All cords should be secured at least 25 mm | |||
by a qualified technician. |
| away from any moving parts. | ||
Contact your | Brother dealer | or a qualified | Furthermore, do not excessively bend the cords | |
or secure them too firmly staples, otherwise | ||||
electrician for any electrical work that may need to | ||||
there is the danger that fire or electric shocks | ||||
be done. |
|
| ||
|
| could occur. | ||
The sewing machine weighs more than 87 kg. | ||||
Be sure to connect the ground. If the ground | ||||
The installation should be carried out by two or | ||||
connection is not secure, you run a high risk of | ||||
more people. |
|
| ||
|
| receiving a serious electric shock, and problems | ||
Do not connect the power cord until installation | ||||
with correct operation may also occur. | ||||
is complete, | otherwise the | machine may | Install the belt covers to the machine head and | |
operate if the start switch is pressed by mistake, |
which could result in injury. | motor. |
|
3-1. Table processing diagram
The top of the table should be 50 mm in thickness and should be strong enough to hold the weight and withstand the vibration of the sewing machine. Drill holes in the table as shown in the diagram below.
0800Q
* There is the special table indicated below.
| Model code |
Table/legs assembly |
5