Brother rh-918a manual Installing the oil container, Installing the operation panel

Models: rh-918a

1 89
Download 89 pages 25.39 Kb
Page 17
Image 17
3-6. Installing the oil container

3. INSTALLATION

3-6. Installing the oil container

2986Q

2985Q

1.Install the oil draining cap support (2) to the base of the bed base (1) with the two screws (3).

2.Screw the oil container (4) into the oil draining cap support (2).

3.Push the oil draining spring pin (5) into the bed base

(1)until the pin is flush with the surface of the base.

4.Lower the machine head. (Refer to "Lowering the machine head" on previous page.)

3-7. Installing the operation panel

2987Q

Top of work table

Table

Bottom of work table

Table

2988Q

The operation panel can be installed to either the top or bottom of the work table.

1.Install the rear frame (1) to the work table (top or bottom) with the four wood screws (2).

2.Install the front frame assembly (3) to the rear frame (1) with the four screws (4).

*The vertical orientation of the front frame assembly (3) is the same whether it is installed to the top or the bottom of the work table.

*Pull the harnesses such as the ground harness out of the way so that the operation panel side cover (5) can be opened and closed.

3.Insert the connector cord (6) into the control box through the hole at the side of the box.

RH-981A

10

Page 17
Image 17
Brother rh-918a manual Installing the oil container, Installing the operation panel