5.Using test function, check unloaders. Press . Key-
pad display reads OUTPUTS. Press
until display
reads UNA2 OFF. Press . Relay energizes. Press
and relay deenergizes. Press
until display reads
UNB2 OFF. Press . Relay energizes. Press
and relay deenergizes.
6.When unloader check has been performed, return LOCAL/
130 (50 Hz),
1.Install control wiring. The minimum wire size for instal- lation is 16 AWG (American Wire Gage). Refer to Fig. 23 and 24 for proper wiring. Open the control box door. Locate unloader relays A and B (UA, UB) in place of the hot gas bypass relays as shown on the component arrangement diagram on the unit. Mount the relays with the
2.Wire the control side. Wire the UA coil in series between
Locate the black wire in the control harness originating from TRAN5 labeled
3.Wire in the solenoid valves.
NOTE: Wires external to the control box must be run in conduit.
Terminal blocks are provided for easy ®eld wiring. Use one of the isolated
4.Con®gure the microprocessor. Once the relays are mounted in the control box, the microprocessor must be con®g- ured for the unloader option. To do so:
a.Be sure the
b. Log into the processor and enter the service func- tion using the keypad and display module.
Press | . The keypad LCD will display |
``PASSWORD.'' Enter , and the keypad LCD will display ``LOGGEDON.''
c.To change the con®guration, press , and the keypad LCD will display ``FLD CFG.'' Press
until either ``NULA 0'' or ``NULA 1'' is displayed (depending on the number of unloaders provided as
standard). Then press
(for 1 unloader on A1)
or (for 2 unloaders on compressor A1). The display will now read either ``NULA 1'' or
``NULA 2,'' as appropriate. Press to get to the NULB display, and change this setting in the same man- ner as with circuit A.
d.Once the con®guration is complete, press , and the keypad LCD will display ``LOGGEDON,''
Press
until the keypad LCD display reads ``LOG
OFF.'' Press and the keypad LCD will display ``EXIT LOG.''
5.Once the unloader heads are installed, the unit is checked for leaks, and the system is prepared for operation per the instructions for the compressor unloader head installa- tion, check the output of the relays using the test function as follows:
a.Press
, and the display will read ``COMP.''
b.Press the to scroll down until the display reads ``CPA1 OFF.''
c.Press
, and the compressor should start.
d.Press
, and the compressor should stop.
e.Press
until the display reads ``UNA1 OFF.''
f.Press
, and the solenoid should energize.
g. Press | and the solenoid should deenergize. |
h.Use the and
keys to check the remainder of the unloader coils.
6.Once the check has been performed, return the LOCAL/
7.Close and secure the control box door.
8.Start the unit and con®rm that the chiller operates properly.
67