38AUZ*25 Compressor Assembly Rear View
Models:
38AU
1
41
56
56
Download
56 pages
45.1 Kb
38
39
40
41
42
43
44
45
Troubleshooting
Install
38AUZ*16 Charging Chart Rtpf
Field Control Wiring
Dimension
Maintenance
Field Refrigerant Access Ports
Adjust Refrigerant Charge
Checklist
Safety
Page 41
Image 41
38AU
C10215
Fig. 40 - 38AUZ*25 Compressor Assembly (Rear View)
C10091
Fig. 41 - 38AUD*25 Compressor Assembly (Rear View)
41
Page 40
Page 42
Page 41
Image 41
Page 40
Page 42
Contents
Contents
Installation, Start---Up Service Instructions
Replacement/Retrofit R-22 to PuronR
Safety Considerations
Installation Guideline
Unit Damage Hazard
Installation
Rtpf
Unit
Mchx
38AUD*25
38AUZ*25
Refrigerant TYPE‡
Unit Size 38AU
Compressor
Condenser Fans
Nominal Capacity kW
Pressurestat Settings kPa High Cutout
Rtpf Shipping Charge kg
Scroll
Face Area sq ft total Rows/Fins per inch FPI
Rtpf Shipping Charge A/B lb
Oil Charge A/B oz
Rtpf Shipping Charge A/B kg
Operating Weight kg Novation Coil Al Tube
Oil Charge A/B L
Qty...r/s Motor Hp Nema Diameter mm
U Z a 2 5 a 0 G 6 a 0 a 0 a
Matching 38AU Model To Evaporator Coil
Installation
Jobsite Survey
Do not Bury Refrigeration Lines
Slab Mount
Provide Safety Relief
Equivalent Lengths for Common Fittings ft
Check 38AU Model with Evaporator Coil Connections
38AUZ 16-25 Piping Recommendations Single-Circuit Unit
Liquid Lift
Suction Riser
Vertical Separation outdoor unit above indoor unit
38AUD 16-25 Piping Recommendations Two-Circuit Unit
Insulate Suction Lines
Hot Gas Bypass
Refrigerant Specialties Part Numbers
Install Filter Driers and Moisture Indicators
Capacity Control Liquid Line Solenoid Valve
Install Liquid Line Solenoid Valve
Selecting an Accumulator
Make Piping Connections
Preliminary Charge
Evacuation/Dehydration
Units with Factory-Installed Disconnect
Field Power Supply
Fire Hazard
All Units
Electrical Operation Hazard
Convenience Outlets
Convenience Outlet Utilization Notice Label
Field Control Wiring
Thermostat
Control Transformer Wiring
Unbalanced 3-Phase Supply Voltage
Unit Wire/Fuse or Hacr Breaker Sizing Data
START-UP
PRE-START-UP
System Check
Preliminary Checks
Adjust Refrigerant Charge
Advanced Scroll Temperature Protection Astp
Using plotted operating point
Start Unit
Final Checks
38AUZ*25 Check Compressor Oil Level
38AUD*16 Charging Chart Novation
38AUZ*16 Charging Chart Rtpf
38AUD*16 Charging Chart Rtpf
38AUD*25 Charging Chart Rtpf
Typical 38AUZ Wiring Diagram 15 Ton 230V Tandem Unit Shown
Typical 38AUD Wiring Diagram 15 Ton 230V Dual Unit Shown
Base Unit Controls
Operating Sequence
Service
Routine System Maintenance
Refrigeration System
Equipment Damage Hazard
Liquid Line Filter Drier
Field Refrigerant Access Ports
Factory High-Flow Access Ports
Input Terminal Voltage
Comfort Alert Diagnostic Module
Lockout
LED Status Codes
Compressor Protection
38AUD Size 16 Cabinet
LPS
38AUZ,D Size 25 Cabinet
38AUZ*25 Compressor Assembly Rear View
Repairing Novation Condenser Tube Leaks
Novation Coil Cleaning and Maintenance
Coil Type Identification
NOVATIONt Type
Unit Reliability Hazard
Routine Cleaning of Round-Tube Plate Fin Rtpf Coils
Replacing NOVATIONt Condenser Coil
Problem Solution Compressor does not RUN
Troubleshooting
Compressor Stops on HIGH-PRESSURE Switch
Fastener Torque Values
Compressor Running but Cooling Insufficient
Problem Solution Compressor Cycles on LOW-PRESSURE Switch
Unit Operates TOO Long or Continuously
System is Noisy
Appendix B
Wiring Diagram List
Appendix a
Troubleshooting
Low Ambient Option Factory Installed
Appendix C
Operation
38AUZ*16 & 38AUD*16 Novation 38AUZ*16/25 & 38AUD*16/25 Rtpf
Motormaster Sensor Location
Dimensions --- MM Unit Baffle
Wind Baffle Dimension
Dimensions --- Inches Unit Baffle
Wind Baffles Fabrication
15 Ton Wind Baffle Brackets Fabrication
Front
Front Back Left Right
Catalog No 38AU---09SI
II. PRE-START-UP Outdoor Unit
START-UP Checklist
Check Voltage Imbalance
Top
Page
Image
Contents