Chapter 2 Installing the Cisco MDS 9100 Series
Starting Up the Switch
Note Customers who require compliance to
To attach the grounding lug and cable to the chassis, follow these steps:
Step 1 Use a
Step 2 Insert the stripped end of grounding cable into the open end of the grounding lug.
Step 3 Use the crimping tool to secure the grounding cable in the grounding lug.
Step 4 Remove the adhesive label from the grounding pad on the chassis.
Step 5 Place the grounding lug against the grounding pad so that there is solid
Step 6 Ensure that the lug and cable do not interfere with other equipment.
Step 7 Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your site to ensure adequate earth ground.
Starting Up the Switch
This section provides instructions for powering up the switch and verifying component installation.
Caution During this procedure, wear grounding wrist straps to avoid ESD damage to the switch.
Note Do not connect the MGMT 10/100 Ethernet port to the LAN until the initial switch configuration has been performed. For instructions on configuring the switch, see the Cisco MDS 9000 Family CLI Configuration Guide. For instructions on connecting to this port, see the “Connecting the Console Port” section on page
To power up the switch and verify hardware operation, follow these steps:
Step 1 Verify that both power supplies and fan modules are installed and tighten any loose captive screws.
Step 2 Verify that the power switches on both power supplies are off. Then plug the power cables into the power supplies and arrange the cables so that they cannot be accidentally pulled out.
Note Depending on the outlet receptacle on your power distribution unit, you may need the optional jumper power cord to connect the Cisco MDS 9100 Series Switch switch to your outlet receptacle. See the “Jumper Power Cord” section on page
Step 3 Connect the other end of the power cables to an AC power source.
| Cisco MDS 9100 Series Hardware Installation Guide |