2.1 What You Will Do

The series of steps here give only a basic outline of the installation process. See the specific sections for details (page numbers in parentheses).

Installation

1.Unpack the Margays. Leave the screens in their containers. You won’t need the screens for a while.

2.If it was purchased, install the VIM (Video Input Module) in each Margay. (10)

3.If it was purchased, install the Big Picture key in each Margay. (12)

4.Build the wall of Margays, leaving the screens off. (14)

5.Connect the Margays to power (26), picture source (22 & 24) and communication. (28)

6.Install the screens, starting with the bottom row. (32)

Configuration

1.Align each optical engine to the screen. (38)

2.Adjust Margay to each of the inputs you will use: analog computer (44), digital (48), video (50).

3.Color balance the wall. (52)

4.Set up Big Picture, if you are using it. (54)

5.Save your work. (62)

8

Page 18
Image 18
Clarity WN-5040-720 manual What You Will Do, Installation, Configuration