Conair MPW Quarterly every 3 months, Annually every 12 months, Preventative Maintenance Schedule

Models: MPW MPA

1 86
Download 86 pages 25.93 Kb
Page 45
Image 45
●Quarterly (every 3 months)

Quarterly (every 3 months)

Inspect power cords, wires and electrical connections.

Check for loose or frayed wires, burned contacts, and signs of overheated wires. Check exterior power cords to the main power source and from the electrical box to the pump and heating elements. Check the ground wire and thermocouple connections. Replace any wire that appears damaged or has worn or cracked insulation.

Annually (every 12 months)

Test and calibrate the unit’s control systems. The chiller’s Test Mode checks the operation

of displays, control buttons, inputs and outputs. You can also calibrate the supply and return thermocouples.

See PERFORMING SYSTEM TESTS in this section.

Clean all surfaces that come in contact with water. Minerals and other water contaminants cause heat- transfer surface fouling and decrease performance, especially in the water-cooled chiller’s condenser. Clean all water-cooled condenser surfaces. The refrigerant side does not foul because the refrigerant acts as a solvent and operates in a closed filter cycle. See CLEANING

EVAPORATORS AND CONDENSERS in this section.

WARNING: Improper servicing may result in equipment damage or per- sonal injury.

This equipment should be installed, adjusted, and serviced by qualified technical personnel who are familiar with the construction, opera- tion and potential hazards of this type of equip- ment.

All wiring, disconnects and fuses should be installed by qualified electrical technicians in accordance with electrical codes in your region.

Only certified refrigerant technicians should recharge the refrigerant used in this system.

Always disconnect and lock out the incoming main power source before opening the electri- cal enclosure or performing non-standard oper- ating procedures, such as troubleshooting or maintenance. Only qualified personnel should perform procedures that require access to the electrical enclosure while power is on.

PREVENTATIVE

MAINTENANCE

SCHEDULE

UGH004/0999

microKool Portable Chillers

MAINTENANCE 5-3

Page 45
Image 45
Conair MPW, MPA manual Quarterly every 3 months, Annually every 12 months, Preventative Maintenance Schedule