Blade n

I/O Module

 

 

Mezz_FAB_B_Blade

Port n

n_Port1

 

Mezz_FAB_B_Blade

Port n

n_Port2

 

Mezz_FAB_B_Blade

Port (n+16)

n_Port3

 

Mezz_FAB_B_Blade

Port (n+16)

n_Port4

 

Mezz_FAB_C_Blade

Port n

n_Port1

 

Mezz_FAB_C_Blade

Port n

n_Port2

 

Mezz_FAB_C_Blade

Port (n+16)

n_Port3

 

Mezz_FAB_C_Blade

Port (n+16)

n_Port4

 

I/O Module Port Mapping—Quarter-Height Blades

NOTE: Up to four quarter-height blades are installed in a sleeve. This section includes all four blades when referring to a sleeve.

Standard LOM (Dual-Port) Mapping

Each LOM has two port connections. For a sleeve in enclosure slot n:

Blade a LOM connection 1 connects to I/O module A1, port n, and connection 2 connects to I/O module A2, port (n+16).

Blade b LOM connection 1 connects to I/O module A2, port n, and connection 2 connects to I/O module A1, port (n+16).

Blade c LOM connection 1 connects to I/O module A1, port (n+8), and connection 2 connects to I/O module A2, port (n+24).

Blade d LOM connection 1 connects to I/O module A2, port (n+8), and connection 2 connects to I/O module A1, port (n+24).

For example, in a sleeve in enclosure slot 8:

Blade a LOM connection 1 connects to I/O module A1, port 8, and connection 2 connects to I/O module A2, port 24.

Blade b LOM connection 1 connects to I/O module A2, port 8, and connection 2 connects to I/O module A1, port 24.

Blade c LOM connection 1 connects to I/O module A1, port 16, and connection 2 connects to I/O module A2, port 32.

Blade d LOM connection 1 connects to I/O module A2, port 16, and connection 2 connects to I/O module A1, port 32.

46

Page 46
Image 46
Dell BMX01 owner manual Module Port Mapping-Quarter-Height Blades, Blade n Module