DreamGEAR MSK 33 manual Operation, Place of installation of the MSK, Mains voltage / mains switch

Models: MSK 33

1 114
Download 114 pages 49.3 Kb
Page 21
Image 21
Operation

Operation

Place of installation of the MSK 33

When installing the unit, ensure, that there is adequate heat dissipation.

To avoid heat build-up, the openings for the ventilators and the ventilation slots on the top of the unit must always be free.

Use the leather case MZK 15 from Kathrein for mobile use.

Mains voltage / mains switch

The unit can be operated on AC current networks of 110...240 V with a network frequency of 50...400 Hz. The unit is automatically set within the allowed voltage range on the connected voltage.

The mains connection socket is located on the rear panel of the unit, and the mains switch is located underneath the mains socket. As soon as the power supply is connected, the green LED lights up on the front panel of the unit and the internal accumulator is charged.

~100-250VAC / 50-400 0.6-0.25A

F1 IEC 127 T1A / 250V

On/Off switch

With the On/Off button on the front panel of the unit, the MSK 33 can be switched on and off. When the MSK 33 is switched off with this button, the last unit setting is stored and activated again when the unit is switched on again.

Safety fuse

For exchanging the mains fuse, please proceed as follows:

￿￿Before exchanging the fuse, the power supply to the unit must be discon- nected.

￿￿First, remove the fuse holder . To do so, insert a screwdriver into the desig- nated gap and pull out the fuse holder.

￿￿After exchanging the fuse, reinsert the fuse holder into the unit.

Only use the following fuse types for the MSK 33:

F1: IEC 127 T1 A / 250 V

Despite mains separation, the unit can still contain voltages via the battery!

21

Page 21
Image 21
DreamGEAR MSK 33 Operation, Place of installation of the MSK, Mains voltage / mains switch, On/Off switch, Safety fuse