Hardware Preparation and Installation

2.2Unpacking and Inspecting the Board

Read all notices and cautions prior to unpacking the product.

Damage of Circuits

Electrostatic discharge and incorrect installation and removal can damage circuits or shorten its life.

Before touching the board or electronic components, make sure that you are working in an ESD-safe environment.

Shipment Inspection

1.Verify that you have received all items of your shipment.

2.Check for damage and report any damage or differences to customer service.

3.Remove the desiccant bag shipped together with the board and dispose of it according to your country’s legislation.

The product is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, contact customer service immediately.

2.3Requirements

Make sure the board meets the requirements specified in the next sections when the board is operated in your particular system configuration.

26

MVME2500 Installation and Use (6806800L01H)

Page 26
Image 26
Emerson MVME2500 manual Unpacking and Inspecting the Board, Requirements, Hardware Preparation and Installation