EMULEX MODEL 375 SAN STORAGE SWITCH

CHAPTER 2: SWITCH INSTALLATION

USERS GUIDE

CHAPTER 2 SWITCH INSTALLATION

Installation Preparation

6

Switch Installation

7

Switch LEDs

9

SFP Compatibility

12

Booting the Switch and SAN

13

Power Supply/Fan Module Replacement

14

INSTALLATION PREPARATION

After receiving the switch, perform the following steps to ensure that the switch and other contents arrived safely.

To unpack the switch:

1.Inspect the outer shipping container for any damage that may have occurred in shipping. Report any sign of damage to the appropriate shipping agency.

2.Remove the switch and cables from the shipping container; save the shipping container, foam, and antistatic bags—returning the switch in any other container is not advised.

Make sure the following parts are included:

Switch unit

RS-232 null-modem serial cable

Power cables (2)

Self-adhesive pads (4)

Retention clips (2), screws (4), and washers (4) for securing the power cords to the switch.

Quick Install Card

Product Release Notes

Safety and Regulatory Guide

Additional documentation, including warranty information and the End User License Agreement.

3.Inspect the switch thoroughly. (If any signs of damage are seen, notify a sales representative and/or the shipping agency.)

EMULEX CORPORATION

6

PART NUMBER 00041392-002 REV. B

Page 9
Image 9
Emulex 375 manual Installation Preparation, To unpack the switch