
Submersible Motor Booster Installation Record
Insulation Check:
Initial Megs: Motor & Lead Only | Black (T1/U1)_________ Yellow (T2/V1)________ Red (T3/W1)_________ |
Installed Megs: Motor, Lead, & Cable | Black (T1/U1)_________ Yellow (T2/V1)________ Red (T3/W1)_________ |
Voltage To Motor: |
|
At Rated Flow of __________gpm | |
At Open Flow ____________gpm | |
Amps To Motor: |
|
At Rated Flow of __________gpm | Black (T1/U1)_________ Yellow (T2/V1)________ Red (T3/W1)_________ |
At Open Flow ____________gpm | Black (T1/U1)_________ Yellow (T2/V1)________ Red (T3/W1)_________ |
At Shut Off* | Black (T1/U1)_________ Yellow (T2/V1)________ Red (T3/W1)_________ |
*Do NOT run at Shut Off more than two (2) minutes.
Inlet Pressure __________psi Outlet Pressure __________psi Water Temperature _______ °F or _______ °C
If you have any questions or problems, call the Franklin Electric
Comments: _____________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
Please sketch the system