Frymaster 24G Series Fryer Operations, Initial Start-up, 24G SERIES FLATBOTTOM GAS FRYERS

Models: 24G Series

1 46
Download 46 pages 26.17 Kb
Page 30
Image 30
CHAPTER 4: FRYER OPERATIONS

24G SERIES FLATBOTTOM GAS FRYERS

CHAPTER 4: FRYER OPERATIONS

4.1 Initial Start-up

4.1 Initial Start-up WARNING

The on-site supervisor is responsible for ensuring that operators are made aware of the inherent hazards of operating a hot oil frying system, particularly the aspects of system operation, oil filtration, draining and cleaning procedures.

Cleaning: New units are wiped clean with solvents at the factory to remove any visible signs of dirt, oil, grease, etc. remaining from the manufacturing process, then coated lightly with oil. Before any food preparation, wash thoroughly with hot, soapy water to remove any film residue and dust or debris then rinse out and wipe dry. Also wash any accessories shipped with the unit. Close the drain valve completely and replace the drain plug. Ensure the temperature-sensing probe is adjusted properly (see illustration).

NOTE: Current production units are equipped with a probe clamp that holds the sensor bulbs in the proper position. Probe adjustment is not normally required.

Sensor Probe Guard

High-Limit/Temperature

 

Probe location

Oil-Return Port (built-in filter

equipped systems only)

Frypot Drain Plug

Frypots with probe-mounting hardware: No special adjustment is required. Temperature probe

bulb may contact oil-return shield in built-in filtration- Manual background equipped frypots. This does not affect probe

operation.

Frypots without probe-mounting hardware: Ensure probe tip is 1/8" from frypot bottom for proper temperature sensing.

Frypot Bottom

4-1

Page 30
Image 30
Frymaster 24G Series operation manual Fryer Operations, Initial Start-up, 24G SERIES FLATBOTTOM GAS FRYERS