Frymaster 24G Series operation manual Gas Conversion Components, Electrical Connections

Models: 24G Series

1 46
Download 46 pages 26.17 Kb
Page 29
Image 29
3.8 Gas Conversion Components

24G SERIES FLATBOTTOM GAS FRYERS CHAPTER 3: INSTALLATION INSTRUCTIONS

3.8 Gas Conversion Components

Use the following components to convert from natural gas to propane and vice-versa. See Section 3.6 for orifice quantities required for conversion.

Natural Gas to Propane Components

Propane To Natural Gas Components

 

 

 

 

 

 

REF

 

DESCRIPTION

REF

 

DESCRIPTION

 

 

 

 

 

 

810-2400

 

Pilot orifice (16LP)

810-0811

 

Pilot orifice (26N)

 

 

 

 

 

 

 

Burner orifice*

 

Burner orifice*

(See Tables on Pages 3-103-11)

(See Tables on Pages 3-103-11)

 

 

New Rating

Contact factory at time of

New Rating

Contact factory at time of

Plate

 

conversion.

Plate

 

conversion.

 

 

 

 

 

 

* Burner orifices listed on pages 3-103-11 are for fryers operating at altitudes of 2000 feet (610 meters) or less. For altitudes greater than 2000 feet (610 meters), contact the factory for the correct orifice size.

3.9 Electrical Connections

The fryer when installed must be electrically grounded in accordance with local codes, or in the absence of local codes, with the appropriate National or European Community (CE) standards.

3.9 Electrical Connections DANGER

This fryer is equipped with a three-prong (grounding) plug for protection against electrical shock and must be plugged directly into a properly grounded, three-prong receptacle. DO NOT CUT, REMOVE, OR OTHERWISE BYPASS THE GROUNDING PRONG ON THIS PLUG!

The rating plate and wiring diagram are located inside the front door. The fryer is equipped with a 115VAC single-phase 60-hertz (Non-CE), or 230VAC single-phase 50-hertz system (International/CE). Do not cut or remove the ground prong from the power cord plug. Do not attempt to use the fryer during a power outage.

Manual background DANGER

This appliance requires electrical power for operation. Place the gas control valve in the OFF position in case of a prolonged power outage. Do not attempt to operate this appliance during a power outage.

3-14

Page 29
Image 29
Frymaster 24G Series operation manual Gas Conversion Components, Electrical Connections