Frymaster 24G Series operation manual Gas Connections, Leveling the Fryer cont, Ce Requirements

Models: 24G Series

1 46
Download 46 pages 26.17 Kb
Page 19
Image 19
3.4 Gas Connections

24G SERIES FLATBOTTOM GAS FRYERS CHAPTER 3: INSTALLATION INSTRUCTIONS

3.3 Leveling the Fryer (cont.)

NOTE: The installation must be inspected after it is complete to ensure it meets the intent of these instructions. The on-site supervisor and/or operator(s) should be informed that the appliance is installed with restraints. If restraints are removed to move fryer (cleaning beneath and behind, relocation, etc.), ensure that they are re-installed when fryer is returned to its permanently installed position.

CE REQUIREMENTS DANGER

The fryer MUST be connected to the gas supply specified on the rating and serial number

plate located on the back of the fryer door.

Manual background WARNING

If gas odors are detected, the gas supply MUST be shut off at the main shut-off valve. The

local gas company or FASC should be contacted immediately to rectify the problem.

3.4 Gas Connections

CE REQUIREMENTS

Dean 24G Series Flatbottom gas fryers have obtained CE markings for countries and gas categories shown below:

COUNTRIES

CATEGORIES

GAS

PRESSURE (MBAR)

 

 

 

20

GERMANY (DE)

II2ELL3B/P

G20/G25; G30/G31

50

 

I3P

G31

50

AUSTRIA (AT)

II2H3B/P

G20; G30/G31

20

50

 

 

 

 

 

 

 

BELGIUM (BE)

I2E(R)B

G20/G25

20/25

I3+

G30/G31

28-30/37

 

DENMARK (DK)

II2H3B/P

G20; G30/G31

20

FINLAND (FI)

30

SWEDEN (SE)

 

 

 

 

 

SPAIN (ES)

 

 

 

GREECE (GR)

 

 

20

ITALY (IT)

II2H3+

G20; G30/G31

IRELAND (IE)

 

 

28-30/37

PORTUGAL (PT)

 

 

 

UNITED KINGDOM (GB)

 

 

 

SPAIN (ES)

II2H3P

G20; G31

20

37 AND 50

 

 

 

II2Esi3+

 

20/25

FRANCE (FR)

G20/G25; G30/G31

28-30/37

 

II2Esi3P

G20/G25; G31

20/25

 

 

50

 

 

LUXEMBOURG (LU)

II2E3B/P

G20; G30/G31

20

50

 

 

 

 

 

 

 

 

II2L3P

G25; G31

25

NETHERLANDS (NL)

50

 

 

II2L3B/P

G25; G30/G31

25

 

 

30

 

 

 

3-4

Page 19
Image 19
Frymaster 24G Series operation manual Gas Connections, Leveling the Fryer cont, Ce Requirements