Operations
6.1 Device Response to the Reset
This section describes how the PDIAG- and DASP- signals responds when the power of the IDD is turned on or the IDD receives a reset or diagnostic command.
6.1.1 Response to power-on
After the master device (device 0) releases its own
If the master device cannot confirm assertion of the DASP- signal within 500 ms, the master device recognizes that no slave device is connected.
After the slave device (device 1) releases its own
DASP- signal: Asserted within 450 ms.
PDIAG- signal: Negated within 1 ms and asserted within 30 seconds.
The asserted