Hardware installation Installing/removing the server in/from the rack

Installing the telescopic rail with variable support

4

1

a

2

3

Figure 5: Fit the left telescopic rail in the PRIMECENTER/DataCenter Rack

ÊPosition the left-hand rail (1) in the support bracket with the vertical lug (a) in the middle square catch.

ÊPress the left rail together until its front end passes behind the front left support upright (2), then release.

ÊSecure the rail on the front left support upright (3) and the support bracket in the rack (4) with two (M5) screws each.

ÊRepeat the steps with the right telescopic rail (to be secured to the right support uprights).

ÊFit the PRIMECENTER/DataCenter Rack cable management as described in the technical manual for the rack.

ÊInsert the server (see the “Inserting the server” on page 43 section).

ÊRoute the cables once the server has been inserted, as described in the Technical Manual for the rack in question.