19 COIL TERM.
OR
CABLE TERM.

Vertical Drilling Motor, Type GE752, GEK±91584D

22

VIEW SHOWING METHOD OF ASSEMBLING CABLES THRU STAPLES.

(PINION END)

54

C

C

20

BEFORE ASSEMBLING CONNECTIONS, INSULATE CABLE SUPPORTS AS SHOWN WITH P19 TAPED WITH P20 (COMM. END)

P27 FOR PRESSURE SWITCH USAGE ON OPPOSITE SIDE ONLY, IF NO PRESSURE SWITCH REQUIRED PLUG HOLE WITH P51

51

SECTION C±C

27,

51

127,10,45

1514

VIEW SHOWING METHOD OF CONNECTING SHUNT CABLES.

MAG. FRAME

WALL

STAPLE

6

SECTION F±F

ATTACH BRUSH HOLDER CABLES AGAINST INSIDE WALL OF MAG. FRAME.

SIDE VIEW OF COMM. CHAMBER

SHOWING PLUGS OPPOSITE SIDE

OF CONNECTION BOX.

 

40,

34

42

 

CARBON

 

BRUSH

 

33

VIEW SHOWING BRUSH HOLDER ASSEMBLY

NOTE FOR P10 AND P15:

INSTALL P10 AND P45 WITH LARGER

TERMINAL ON EXC. COIL CONNECTION.

NOTE FOR P52 AND P53:

INSTALL P52 AND P53 ON CONNECTION

BOX END OF P10 AND P45.

 

 

 

60,

CONNECTION

61,64

 

63

 

 

BOX

A2

A1

 

 

 

 

 

GROUND A1 AND A2

VIEW AT E

 

 

CABLES WITH P65

 

 

 

(G3 AND G4)

 

 

MODELS

SEE TABLE 2, PAGE 20

FIG. 30. COILED FRAME ASSEMBLY (41D732345 CHG. V). E±39095A.

49

Page 49
Image 49
GE GE752 manual BOX Ground A1 and A2 View AT E Cables with P65