Vertical Drilling Motor, Type GE752, GEK±91584D

CAUTION: Zero settings of advance gauge

hub is nearly in engagement with the taper fit (not

in actual contact), snap it forcibly into place with a

must not be disturbed until all readings on the

quick push. It is important that the hot hub be in-

hub are completed.

stantly snapped into position before it has

 

 

cooled; otherwise, it will freeze to the shaft and

Heat the hub in an oven until it has reached a uni-

cannot be adjusted further.

 

form temperature (the desired number of de-

6. Check the hot or shrunk±on position of the hub

grees above shaft temperature). For example, if

on the shaft. The advance from cold to hot posi-

shaft temperature is 25￿ C (77￿ F), heat hub to

tion along the axis of the shaft must be held with-

25￿ C (77￿ F) +171￿ C (339￿ F) = 196￿ C (385￿

in the limits indicated. Check the actual advance

F). This procedure should provide an advance of

with an indicator gauge, located in the same rela-

approximately 0.085 in.

tive position as used to measure the cold position

 

An accurate method must be provided for mea-

in Step 3, Fig. 41.

 

suring hub and shaft temperatures quickly be-

If the advance is not within specified limits, re-

fore mounting the hub. This can best be done

move the hub and repeat the assembly proce-

with a hand pyrometer. In using the pyrometer,

dure.

place points of the gauge inside the bore of the

 

hub, Fig. 42.

TESTING AFTER OVERHAUL

NOTE: The part must be left in the oven long

TESTING SERIES MACHINES

enough for the heat to penetrate throughout the

(Models 5GE752AUP, AUT)

part.

 

Measure the temperature of the shaft and the hub with the same instrument.

5.Insure that the hub bore and the shaft taper are clean. Then, using adequate hand protection, quickly mount the hot hub on the shaft in the same angular position as when cold. When the

FIG. 41. METHOD OF USING ADVANCE

GAUGE. E±5975A.

After the motor has been reconditioned and reas- sembled, make the following tests to assure it will oper- ate satisfactorily.

Connect the motor to a d±c arc±welding generator, Fig. 7. Refer to connection diagrams, Figs. 22 and 24, for connections. Run the machine series±connected without load at 900 rpm and measure bearing tempera- tures.

1.Use Duxseal* putty to hold the thermometers on the drive end and commutator±end outer bear-

PLACE PYROMETER

POINTS IN BORE

OF HUB

FIG. 42. MEASURING TEMPERATURE OF

COUPLING HUB WITH PYROMETER. E±5976.

67

Page 67
Image 67
GE manual Testing After Overhaul, Testing Series Machines, Models 5GE752AUP, AUT