8)Install the new drier (see “4. DRIER”).

Hot Gas Valve

Fig. 4

WARNING

Always protect the valve body by using a damp cloth to prevent the valve from overheating. Do not braze with the valve body exceeding 275°F (135° C).

8)Install the new drier (see “4. DRIER”).

9)Check for leaks using nitrogen gas (10 bar) and soap bubbles.

10)Evacuate the system and charge it with refrigerant (see “1. [c] EVACUATION AND RECHARGE”).

11)Attach the solenoid coil to the valve body, and secure it with the screw.

12)Connect the lead wires.

13)Refit the panels in their correct positions.

14)Plug in the icemaker or connect the power source.