Installation

2

Installation

In this chapter, you are shown how to install your DCS9550 1S1 Storage Expansion Unit and plug-in modules into an industry standard 19 inch rack cabinet.

Caution When connecting up the DCS9550 1S1 Storage Expansion Unit, use only the power cords supplied or cords which match the specification quoted in section 1.4.5.

2.1Planning Your Installation

Before you begin installation you should become familiar with the configuration requirements of your DCS9550 1S1 Storage Expansion Unit, detailed in Table 2–1.The correct positions of each of the optional plug-in modules are shown in Table 2–1.Please refer to sections 2.4 - 2.7 for details of SCM I/O module configurations and installation.

Table 2–1

DCS9550 1S1 Storage Expansion Unit Configuration

 

 

 

Module

 

Location

 

 

 

Drive Bays

 

ALL drive bays must be fitted with either a drive carrier module

 

 

or a dummy carrier, no bays should be left completely empty.

 

 

Drive carrier modules 0 & 15 provide SES Management Services.

 

 

Power Supply/

Two Power Supply/Cooling modules must be fitted. Full power

Cooling Modules

and cooling redundancy is provided while a faulty module is

 

 

replaced. Install the Power Supply/Cooling modules in rear Bays

 

 

1 and 5.

 

 

Note: Rear bays are numbered from 1 to 5 commencing from the right

 

 

side.

 

 

SCM I/O Module

One SCM module should be installed in rear Bay 3. A blank

 

 

module is fitted rear Bay 4.

 

 

 

IBM System Storage DCS9550 1S1 Storage Expansion Unit Installation, Service, and User Guide

15

Page 30
Image 30
IBM DCS9550 1S1 manual Planning Your Installation