248
Chapter 22
Figure 22-42
Cox Regression dialog box, Time and Event tab
ESelectVaries by subject and select Length of stay for rehabilitation [los_rehab] as the start variable.
Note that the restructured variablehas taken the variable label from the rst variable used to
construct it, thoughthe label is not necessarily appropriate for the constructed variable.
ESelect Time to rst event post-attack [time_to_event] as the end variable.
ESelect First event post-attack [event] as the status variable.
EClick Define Event.