Intel Raptor AT manual Performing the DMA controller 2 base register test next

Models: Raptor AT

1 80
Download 80 pages 27.84 Kb
Page 72
Image 72

 

Raptor AT – Installation Guide

 

 

 

 

 

 

 

 

 

 

Checkpoint

Description

 

 

 

Code

 

 

 

 

 

 

 

 

4Eh

The memory test started, but not as the result of a soft

 

reset. Displaying the first 64 KB memory size next.

 

 

 

 

The memory size display has started. The display is

 

4Fh

updated during the memory test. Performing the

 

 

sequential and random memory test next.

 

 

 

 

The memory below 1 MB has been tested and

 

50h

initialized. Adjusting the displayed memory size for

 

 

relocation and shadowing next.

 

 

 

 

51h

The memory size display was

adjusted for relocation

 

and shadowing. Testing the memory above 1 MB next.

 

 

 

52h

The memory above 1 MB

has been tested and

 

initialized. Saving the memory size information next.

 

 

 

53h

The memory size information and the CPU registers are

 

saved. Entering real mode next.

 

 

 

 

 

 

 

 

 

54h

Shutdown was successful. The

CPU is in real mode.

 

Disabling the Gate A20 line, parity, and the NMI next.

 

 

 

 

The A20 address line, parity, and the NMI are disabled.

 

57h

Adjusting the memory size depending on relocation and

 

 

shadowing next.

 

 

 

 

58h

The memory size was adjusted for relocation and

 

shadowing. Clearing the Hit <DEL> message next.

 

 

 

 

The Hit <DEL> message is cleared. The <WAIT...>

 

59h

message is displayed. Starting the DMA and interrupt

 

 

controller test next.

 

 

 

 

60h

The DMA page register test passed. Performing the

 

DMA Controller 1 base register test next.

 

 

 

 

 

 

 

62h

The DMA controller 1 base

register test

passed.

 

Performing the DMA controller 2 base register test next.

 

 

 

65h

The DMA controller 2 base

register test

passed.

 

Programming DMA controllers 1 and 2 next.

 

 

 

 

 

 

 

66h

Completed programming DMA controllers 1

and 2.

 

Initializing the 8259 interrupt controller next.

 

 

 

 

 

 

 

67h

Completed 8259 interrupt controller initialization.

 

7Fh

Extended NMI source enabling is in progress.

 

 

 

 

The keyboard test has started. Clearing the output buffer

 

80h

and checking for stuck keys. Issuing the keyboard reset

 

 

command next.

 

 

 

 

81h

A keyboard reset error or stuck key was found. Issuing

 

the keyboard controller interface test command next.

 

 

62

Page 72
Image 72
Intel Raptor AT manual Performing the DMA controller 2 base register test next