Site Preparation Checklist

 

Performed

 

 

Item or Task

By

Date

Notes

Select the type of rack.

Plan rack location, including required space clearances.

Secure rack to floor and building structure.

Acquire cables and connectors.

Locate sites for connection of system grounding.

Calculate power budget and power margin.

Prepare for Router Installation

53

Page 73
Image 73
Juniper Networks M5, M10 manual Site Preparation Checklist