LG Electronics GR-P227/L227 How To Install Refrigerator, Connection of Pipe Connector A and B

Models: GR-P257/L257 GR-P227/L227

1 99
Download 99 pages 61.41 Kb
Page 14
Image 14
1. Connection of Pipe Connector A and B.

HOW TO INSTALL REFRIGERATOR

1. Connection of Pipe Connector A and B.

1)Turn off main valve of water pipe.

2)Disconnect water tap from piping by loosening nuts.

3)Connect pipe connector A and B to piping after sealing the pipe connector with sealing tapes.

4)Connect feed valve to pipe connector A.

5)If there is only one tap water pipe, connect pipe connector A only and install feed pipe.

Caution : • Feed pipe should be connected to cold water line. If it is connected to hot water line, trouble may occur.

Please check rubber packing when connecting feed pipe.

Pipe Connector B

Feed

 

Hot Water

Valve

 

Pipe Connector A

 

Cold Water

How to wind

Sealing Tapes.

Single Lever Type Faucet (general)

Feed

Valve

Two Hands Type Faucet

Feed

Valve

General Type

Feed

Valve

Single Lever Type Faucet (one hole, tech type and hand spray)

Feed

Valve

2. Water Supply

1)After the installation of feed water, plug the refrigerator to the earthered wall outlet, press the water dispenser button for 2 - 3 minutes, and confirm that the water comes out.

2)Check leakage at connecting part, then arrange water tube and locate the refrigerator at its regular place if there is no leaking.

Water Tube

Water Tube

Nut

- 12 -

Page 14
Image 14
LG Electronics GR-P227/L227 How To Install Refrigerator, Connection of Pipe Connector A and B, Hot Water, Cold Water