Inspecting the server interior 31
2Apply pressure evenly until the bezel snaps onto each ball stud.
3Close and lock the double doors of the front bezel.
—End—
Nortel CallPilot
1002rp Server Hardware Installation
5.0 23 February 2007
Copyright © 2007, Nortel Networks | Nortel Networks Confidential |