Rack power and grounding

DC rack cabling 39

Rack power and grounding

To ensure a complete power and grounding installation:

In rackmount server installations, ensure the CallPilot server chassis and equipment racks are isolated from other foreign sources of ground. Acceptable isolation methods include: isolation pads, grommeted washers, chassis side rail strips, and non-conducting washers.

In rackmount server installations where other equipment is also installed in the same 19" rack, ensure that all equipment derives ground from