Nortel Networks NN44200-300 Unpacking the 1002rp server, To unpack the equipment, Introduction

Models: NN44200-300

1 64
Download 64 pages 52.34 Kb
Page 26
Image 26
Unpacking the 1002rp server

26Chapter 3 Preparing for installation

CAUTION

Alerts you to situations where data can be lost or damaged, equipment can be damaged, actions can result in service interruption, and productive time can be lost.

ATTENTION

Provides information that is essential to the completion of a task.

Unpacking the 1002rp server

Introduction

Follow this procedure to unpack the server and peripherals.

WARNING

The 1002rp CallPilot server weighs approximately 34 kg (75 lb) as shipped from manufacturing. To prevent personal injury, have someone help you to unpack and position the server.

To unpack the equipment

Step Action

ATTENTION

As you unpack each item, check it off against the packing list, as well as against the following checklists provided in the Installation and Configuration Task List (NN44200-306):

"CallPilot software media and documentation checklist"

"CallPilot server hardware checklist"

1Carefully open the cardboard carton containing the server.

2Remove the server from the carton; set it on the floor.

3Carefully open the cartons containing the monitor, keyboard, mouse, modem, and ELAN hub (if supplied), and set the peripherals aside.

4Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals in a safe place.

5Save all packing materials and cartons in case you must return any equipment to the carrier.

—End—

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Page 26
Image 26
Nortel Networks NN44200-300 manual Unpacking the 1002rp server, To unpack the equipment, Introduction, Step Action