24Chapter 3 Preparing for installation

Step

Description

Check

2Unpack the server, and ensure you have all the items you need (see "Unpacking the 1002rp server" (page 26)).

Complete the following checklists that are provided in the Installation and Configuration Task List (NN44200-306):

"CallPilot software media and documentation checklist"

"CallPilot server hardware checklist"

3Remove the front bezel and server cover, and inspect the interior (see pages "Removing the front bezel and server cover" (page 27) and "Inspecting the server interior" (page 29)).

4Replace the server cover.

5Install the power supply modules in the server (see "Installing the second power supply module (AC or DC)" (page 34)).

6For a DC-powered server, set up the DC power source (see "DC wire gauge tables" (page 36)).

7

Place the 1002rp server in the chosen location (see "Installing the server" (page 43)).

8Replace the front bezel (see page "Inspecting the server interior" (page 29)).

9Set the DIP switches on the modem (see "Preparing the modem" (page 44)).

10Connect the 1002rp server and devices as follows:

Connect the monitor, keyboard, and mouse (see "Connecting peripherals to the server" (page 47)).

Connect the modem (see "Preparing the modem" (page 44)).

Connect the 1002rp server to the ELAN hub or switch (Meridian 1 or Communication Server 1000 only) (see "Connecting the server to the ELAN subnet" (page 49)).

ATTENTION

To comply with EMC radiation requirements, a Class A hub must be located 10 m (33 ft.) away from the 1002rp server. Shielded Ethernet cables must be used.

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Page 24
Image 24
Nortel Networks NN44200-300 manual Preparing for installation