Nortel Networks NN44200-300 manual To replace the front bezel after installation is complete

Models: NN44200-300

1 64
Download 64 pages 52.34 Kb
Page 30
Image 30
Installation and Configuration

30 Chapter 3 Preparing for installation

 

 

IF

THEN

 

 

 

 

components have become loose

secure them.

 

 

Refer to the procedures in the

 

 

Installation and Configuration

 

 

Task List (NN44200-306).

you are satisfied that the 1002rp server has arrived at your site undamaged

replace the server cover and proceed with the hardware installation.

See "Installation checklist" (page 23).

Note: Do not reinstall the front bezel until the server is in its final location and the CallPilot installation is complete.

—End—

To replace the front bezel after installation is complete

Step Action

When the CallPilot server installation is complete and the server is in its final location, replace the front bezel.

1Align the front bezel with the ball studs located at each faceplate corner.

See the diagram below:

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Page 30
Image 30
Nortel Networks NN44200-300 To replace the front bezel after installation is complete, Step Action, See the diagram below