Setting up the baseline hardware

Copyright © 2006 Nortel Networks

Setting up the baseline hardware

Baseline hardware

See the following figure for an overview of the hardware connectivity.

Figure 3 Hardware connections overview

ATTENTION

You need an uninterrupted power source (UPS).

If a power outage occurs, bring the server for the Database Module into service before bringing the other servers into service. If other servers do not come up, restart the server for the Management Module.

MCS 2-server Sun Fire V100 Solaris Installation and Commissioning Guide

Page 25
Image 25
Nortel Networks V100 manual Setting up the baseline hardware, Baseline hardware, Hardware connections overview