Setting up rack to mount hardware

Copyright © 2006 Nortel Networks

27

Media Application Server: 1 IBM x336 (2 3.6 GHz Xeon, 1-GB RAM, 1 73-GB SCSI drive, Windows 2000)

Multimedia PC Clients

ATTENTION

Make sure you have

Business Policy Switch 2000 (BPS 2000) or Layer-2 switch

vendor documentation for configuring your Layer-2 switch

one (1) additional cat-5 ethernet cable to connect the MRV LX terminal server to the layer-2 switch

a pc for the System Management Console, and access to the network

WARNING

Static electricity could be harmful to the servers.

Setting up rack to mount hardware

Procedure 1 Setting up rack to mount hardware

At the rack,

1Mount all equipment. Refer to the following diagram that displays the mounting for the rack.

Mount Layer-2 switch.

Mount the MRV LX terminal server.

Mount Sun Fire V100s.

Database/Management/Accounting server

Application server

(optional equipment) Mount conference server. Refer to the Media Application Server documentation for more information.

(optional equipment) Mount gateway. Refer to customer-specific gateway installation documentation.

Note: All MCS equipment is 19-inch rack mountable.