Operation
2. OPERATION
About this Chapter
This chapter explains how to perform the functions you’ll use most often. It assumes you’ve installed the equipment correctly and set it up the way you want. If you haven’t yet set up your system, or you’d like to change one or more setup options, follow the instructions in Chapter 3.
Operating Checklist
Before operating the system, check the following:
•Make sure the Postage Meter is correctly fitted to the Mailing Machine (see page
•Make sure the system is plugged into a suitable mains wall socket and the socket is turned ON. Follow the safety precautions in Chapter 1.
•Check the level of sealing solution in the moistener (DM300 system only). See Chapter 5.
•If you plan on printing tape strips (DM300 system only), make sure you’ve loaded an adequate supply. See Chapter 5.
•Check that you have enough postage to handle your job (press Funds to view the postage available). If you don’t, refill the meter (Chapter 4).
Unlocking and Locking the Meter
Your Postage Meter may require you to enter a
If your meter is set up with accounting passwords, it prompts you for a password each time you select an account.
Error Messages
Your meter may occasionally display a message telling you that something needs attention or that an error condition occurred. These messages usually tell you how to fix whatever’s wrong. See Chapter 6 for a complete listing of error messages.