MNA1MLSDM00EN, V2.01, 07.2009

PAS 4S Writing conventions and symbols

Portal axes with ball screw drive 7
Writing conventions and symbols
Work steps If work steps must be performed consecutively, this sequence of steps
is represented as follows:
쮿Special prerequisites for the following work steps
Step 1
Specific response to this work step
Step 2
If a response to a work step is indicated, this allows you to verify that the
work step has been performed correctly.
Unless otherwise stated, the individual steps must be performed in the
specified sequence.
Bulleted lists The items in bulleted lists are sorted alphanumerically or by priority. Bul-
leted lists are structured as follows:
Item 1 of bulleted list
Item 2 of bulleted list
–Subitem for 2
–Subitem for 2
Item 3 of bulleted list
Making work easier Information on making work easier is highlighted by this symbol:
Sections highlighted this way provide supplementary
information on making work easier.
SI units SI units are the original values. Converted units are shown in brackets
behind the original value; they may be rounded.
Example:
Minimum conductor cross section: 1.5mm2 (AWG 14)