4 Installation

PAS4S

 

 

4.1Preparing installation

A

B

The linear axis is a precision product and must be handled with care. Shocks and impacts may damage the guides and the ball screw drive. This may cause inaccuracies and even premature failure.

Transport the product in its packaging as close as possible to the instal- lation site. Do not remove the packaging until the product is at the instal- lation site.

The linear axis may only be lifted at points A and B (see figure). The dis- tance between the end block and point A and between the end block and point B should be ¼ of the total length of the linear axis. If an axis with a mounted motor is lifted, points A and B are to be moved to balance the load. The motor must not be used to lift the load. However, support the motor when lifting the axis.

MNA1MLSDM00EN, V2.01, 07.2009

46

Portal axes with ball screw drive

Page 46
Image 46
Schneider Electric PAS4S manual Preparing installation