Preparation Overview

The purpose of the preparation section is to help you prepare your machine for operation. The list below outlines the basic process to follow to prepare the lathe for operation. Specific steps for each of these points will be covered in detail later in this section.

The typical preparation process is as follows:

1.Unpack the lathe and inventory the contents of the box/crate.

2.Clean the lathe and its components.

3.Identify an acceptable location for the lathe and move it to that location.

4.Level the lathe and either bolt it to the floor or place it on mounts.

5.Assemble the loose components and make any necessary adjustments or inspections to ensure the lathe is ready for operation.

6.Connect the lathe to the power source.

7.Test run the lathe to make sure it functions properly and is ready for operation.

Things You'll Need

To complete the preparation process, you will need the following items:

For Lifting and Moving

ss!!&ORKLIFT ORL/THERT0OWERR,IFTINGH$EVICE

(rated for at least 5000 lbs).

ss,IFTINGT3TRAP or Chain with Hook (rated for at least 5000 lbs.)

ssHelper for moving machine. ss Two 12" 2x6's

ss 0RECISIONI,EVEL

For Power Connection

ss!!QUALIFIEDLELECTRICIAN TO ENSURETARSAFE AND code-compliant connection to the power source. (Refer to Page 15 for details.)

For Assembly

ssCotton Rags

ssMineral Spirits

ssQuality Metal Protectant Oil ss 3AFETY 'LASSES

ss Wrench or Socket 21mm ss Wrench or Socket 19mm

ss &LOORO-OUNTING (ARDWARE as Needed ss Standard Screwdriver #2

Unpacking

This item was carefully packaged to prevent damage during transport. If you discover any damage, please immediately call Customer Service at (360) 734-1540 for advice. You may need to file a freight claim, so save the containers and all packing materials for possible inspection by the carrier or its agent.