State Industries SUF-100-250 Diagrams, 5 J2 J1, J3 J5, Ccb Central Control Board, S1 DIPSWITCH

Models: SUF-60-120 SUF-100-250

1 80
Download 80 pages 61 Kb
Page 67
Image 67
Diagrams

Diagrams

CCB - Central Control Board Layout

CCB (CENTRAL CONTROL BOARD)

1

1

22

33

44

5J2

J1

1

21

42

J3 J5

 

1 Retry

4

 

3

 

 

Retries

 

 

 

OPEN

Ext

Use

Yes

2 3

No

Input

Type

Tstat

Vent

 

Spare

1

 

Spare

 

 

 

S1 DIPSWITCH

J4

 

15

12

9

6

 

3

J6

14

11

8

5

 

2

 

13

10

7

4

 

1

 

 

 

 

 

 

 

 

 

J7

 

 

 

 

 

 

4

3

2

1

J10

1

3

2

4

 

 

 

J9

J13

 

J11

1

5

 

 

J16

2

6

J15

 

 

 

3

7

1

 

4

8

2

 

 

S1 DIPSWITCH DETAIL

 

1 Retry

4

 

3

 

 

Retries

 

 

 

OPEN

Ext

Use

Yes

2 3

No

 

 

 

Input

Type

Tstat

Vent

 

Spare

1

 

Spare

 

 

 

Dipswitch Operation:

Along one side of the dipswitch array there are numbers, 1-4. On the other side of the dipswitch

is the word “OPEN.” The dipswitches are rocker type switches, if one side of the rocker is down the other side will be up. Pressing a rocker down on the side of the array labeled “OPEN,” opens the switch. Pressing a rocker down on the side of the array labeled with the numbers 1-4 closes the dipswitch.

CHANGING NUMBER OF IGNITION TRIALS BEFORE LOCK OUT

NOTE: Always turn off power to the water heater before changing dipswitch settings.

Set dipswitch #4 to the open position for 1 trial for ignition before Ignition Failure lock out. Set dipswitch #4 to the closed position for 3 trials for ignition before Ignition Failure lock out.

Figure 65

67

Page 67
Image 67
State Industries SUF-100-250, SUF-60-120 Diagrams, 5 J2 J1, J3 J5, Ccb Central Control Board, S1 DIPSWITCH DETAIL