State Industries SUF-60-120, SUF-100-250 instruction manual Vertical Termination - Direct Vent

Models: SUF-60-120 SUF-100-250

1 80
Download 80 pages 61 Kb
Page 28
Image 28
VERTICAL TERMINATION(S) INSTALLATION

2” (5 cm)

MAXIMUM VERTICAL TERMINATION - DIRECT VENT

FACTORY SUPPLIED

STANDARD TERMINATION

24 INCHES (61 cm) MINIMUM

48 INCHES (122 cm) IN COLDER CLIMATES

FIELD

SUPPLIED 90° ELBOW

FIELD SUPPLIED PLUMBING ROOF BOOT OR FLASHING

POINTED DOWN TOWARDS

THE GROUND

NOTE: INTAKE AIR

TERMINATION

SHOWN HERE

FIELD

SUPPLIED 90° ELBOW

VENT (EXHAUST) VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE TERMINATION Manual background

FACTORY SUPPLIED STANDARD TERMINATIONS POINTED DOWNWARD

INTAKE AIR

TERMINATION

MAINTAIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL.

MAINTAIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL.

FIELD

SUPPLIED

STRAP/SUPPORT

VERTICAL TERMINATION(S) INSTALLATION

INTAKE AIR AND/OR VENT (EXHAUST)

Figure 23

IF LESS THAN

10 FEET (3 m)

 

 

 

 

 

NOTE: VENT

24 INCHES (60 cm)

TERMINATION

MINIMUM HEIGHT ABOVE

SHOWN HERE

INTAKE AIR AND/OR VENT TERMINATION(S) MUST BE A MINIMUM OF 24 INCES (60 cm)

ABOVE ANY PARAPET, VERTICAL WALL OR STRUCTURE WITHIN 10 FEET (3 m) HORIZONTALLY.

FIELD SUPPLIED

PLUMBING

ROOF BOOTS

OR FLASHINGS

VERTICAL TERMINATION - DIRECT VENT

STANDARD TERMINATIONS

Figure 25

VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE

INTAKE AIR AND/OR VENT (EXHAUST)

Figure 24

28

Page 28
Image 28
State Industries SUF-60-120, SUF-100-250 Vertical Termination - Direct Vent, Vertical Terminations Installation