Toshiba 245 Preparation 1 Turning Power on, Turning power on, Press the power switch to on side

Models: 225 245 e-STUDIO195

1 228
Download 228 pages 23.75 Kb
Page 38
Image 38

1 PREPARATION

Preparation 1 - Turning Power ON

Turning power ON

1 Press the power switch to “ ” (ON) side.

The equipment starts warming itself up. The warm-up time takes approx. 25 seconds. When the warm-up has finished, the equipment is ready for copying. “READY” appears on the LCD screen.

READY

 

100%

 

NONSORT

 

ZOOM

 

FINISHING

 

 

 

 

 

 

 

 

 

 

1

EDIT

 

If you press the [START] button with an original placed while the warm-up is still continu-

 

ing, copying automatically starts after it has finished. This is called auto job start. When

 

the job is reserved, “Auto Start” appears on the LCD screen to show you the current sta-

 

tus.

 

However, this function cannot be accessed while “Please wait” is being displayed

 

(approx. 15 seconds).

2

The LCD screen below is shown if the equipment is managed under

the department code function. Key in the department code.

Enter DEPARTMENT CODE

100% NONSORT ZOOM FINISHING

1

EDIT

Key in a 5-digit department code, and then press the [ENTER] button. Then the equipment is ready for copying.

If the department code function is enabled, press the [FUNCTION CLEAR] button after any operation has been finished to prevent unauthorized use of the equipment.

For the details of the department code, see the following page: P.143 “Department Code”

36 Preparation 1 - Turning Power ON

Page 38
Image 38
Toshiba 245, 225, e-STUDIO195 manual Preparation 1 Turning Power on, Turning power on, Press the power switch to on side